10kVA Hybrid Solar vs. Diesel Generator ROI in brief

 To help you visualize the long-term savings of switching from diesel to solar, let's look at a typical ROI (Return on Investment) analysis for a medium-sized industrial kitchen in Nigeria.



ROI Calculation: 10kVA Hybrid Solar vs. Diesel Generator

We will compare a 10kVA Solar/Lithium System against a 20kVA Diesel Generator running for an average of 8 hours per day (covering typical grid outages).

Cost Component (3-Year Period)20kVA Diesel Generator10kVA Hybrid Solar System
Initial Purchase₦18,000,000₦16,500,000
Fuel/Charging Cost₦43,800,000 (at 10L/hr, ₦1,500/L)₦0 (Sunlight is free)
Maintenance/Service₦3,600,000 (Oil, filters, labor)₦450,000 (Cleaning panels)
Battery/Engine Overhaul₦2,500,000 (Top-end rebuild)₦0 (Lithium lasts 10+ years)
Total 3-Year Expense₦67,900,000₦16,950,000

Total Savings over 3 Years: ₦50,950,000


Recommended Equipment Checklist by Business Type

Based on your power constraints and professional needs, here are the configurations we recommend for 2026.

1. The Professional Bakery

  • Essential Gear: Gas-Powered 2-Deck 4-Tray Oven (Reduces electric load by 80%), 20L Industrial Cake Mixer, and a Bread Slicer.

  • Backup Recommendation: 5kVA Inverter + 2 Lithium Batteries. This easily runs the mixer and slicer since the oven uses gas for heat.

2. The Restaurant/Quick Service Spot (QSR)

  • Essential Gear: 3-Burner Gas Shawarma Machine, Double Tank Electric/Gas Fryer, Bain Marie, and a Double Door Showcase Chiller.

  • Backup Recommendation: 10kVA Hybrid Solar System. The heavy lifting is done by gas, while the solar handles the constant cooling and food warming.

3. The Hotel/Large Catering Kitchen

  • Essential Gear: Commercial Dishwasher, 6-Burner Industrial Range, Walk-in Cold Room, and Industrial Ice Maker.

  • Backup Recommendation: 20kVA - 50kVA Soundproof Generator + 15kVA Solar Buffer. The solar handles the lighting and basic fridges 24/7, while the generator kicks in only when the heavy Dishwasher or central AC is active.


Next Steps for Your Installation

To ensure your kitchen is "grid-failure proof," we recommend the following professional path:

  1. Load Audit: Have a technician from Royal Coast Technologies measure your actual "Startup Amps" for your mixers and chillers.

  2. Phase Balancing: If you have 3-phase power, ensure your "always-on" appliances are balanced across phases so your inverter doesn't overload.

  3. Procurement: Purchase your Industrial Kitchen Equipment and Power Backup Systems directly from Kara Nigeria to ensure compatibility and warranty coverage.

Would you like us to connect you with a technical consultant at Kara to get a formal quote for a custom Solar-Gas hybrid setup for your specific location?

Comments